A busy joinery workshop with high daytime electricity usage from machinery. They were facing soaring energy bills that were eating into their profit margins.
We designed a 12kW 3-phase system using high-wattage 585W Jinko Commercial Modules. The system connects directly to their distribution board, offsetting the power used by saws and extraction units in real-time.
The business has reduced its grid draw by 60% during operating hours. The system is projected to pay for itself in just 3.8 years thanks to the high self-consumption rate.
26%
ROI
3.8 Years
Payback
2.8 Tons/yr
CO2 Saved